
Civil
Park & Playground Footpaths
Rockhampton · Curved pedestrian paths around a playground
Reinforcement Done Properly
Quality in every pour
Concrete is only as strong as the steel inside it. NWC Concreting provides steelfixing and formwork for slabs, walls and structural pours across Yeppoon, Rockhampton and Central Queensland.

What We Do
Reinforcing steel gives concrete its strength. Bars, mesh and cages need to be fixed in the right position, at the right spacing and to the requirements of the project before a single load of concrete arrives.
Our steelfixing work ranges from reinforcing mesh for residential slabs through to dense, double-layer cages for tall structural walls, with formwork set around the steel ready for the pour.
Because NWC Concreting also pours the concrete, the steel and the pour are coordinated by one team. That means fewer handovers and a reinforcing job that's ready when the trucks arrive.
Mesh, bars and chairs set before residential and commercial slab pours.
Reinforcing cages and starter bars for structural concrete walls.
Formwork for walls, slabs and trenches, set around the reinforcing steel.
Steel fixing for trenches, footings and civil concrete works.
Local Knowledge
Our steelfixing projects span residential, commercial and civil work around Yeppoon and Rockhampton, from backyard shed slabs to structural walls on larger sites.
Coastal exposure is worth considering for reinforced concrete in seaside areas, so the requirements of each project, including any engineering specifications, are discussed before the steel is fixed.

Civil
Rockhampton · Curved pedestrian paths around a playground

Steelfixing
Yeppoon · Heavy reinforcing cage ready for wall formwork

Civil
Rockhampton · Trench base poured with starter bars

Steelfixing
Yeppoon · Steel fixing and formwork for structural walls

Steelfixing
Yeppoon · Mesh and bar chairs set before the pour

Civil
Rockhampton · Broom-finish path around a feature bed
Steelfixing is the placement of reinforcing steel, such as bars, mesh and cages, inside formwork before concrete is poured. The steel gives the finished concrete its strength, so it needs to be set correctly and to the project requirements.
Yes. Our projects include formwork for structural walls and slabs, with the reinforcing steel fixed in place ready for the pour.
We regularly handle both steelfixing and concreting as one team. If you have a project that needs reinforcing work, call Nigel to discuss what's required.
Structural walls, slabs, trenches and footings all rely on reinforcing steel. Our work ranges from residential slab mesh through to heavy reinforcing cages for tall structural walls.
Yes. Based in Yeppoon, NWC Concreting services Rockhampton and Central Queensland. Call 0487 701 946 to discuss your project.
Quality in every pour
Call Nigel on 0487 701 946 or send through a quote request to discuss the reinforcing and formwork for your pour.